Steering Group Discussion |
First, our
apologies for not getting in touch sooner. We expected to
meet in a month, but the steering group came to the
conclusion that here were was too little information
available and too many planning ideas dependent upon First
Ave not going through to Ash.We met April 7th with the
RAV station planner, Anita Molaro, Chris Robertson and
engineer Donny Wong. These city staff welcomed our
participation and ideas and indicated their willingness to
work with us to address issues and amenities.
It seems that some of their ideas mesh with the ideas
that came out of the planning, including: the continuation
of wide sidewalk on east side of Cambie, across 6th to north
side and a public space west of Bridge at RAV station, with
pedestrian walkway past NEU building to the Creek. The
parking along Spyglass for the marina will disappear. We
were told there was no engineering preference for the flow
of traffic from First Ave, west to Ash. We outlined our
concerns with this option. Subsequently, we have written a
letter stating our understanding that we would be involved
in decisions, and not reacting to decisions already made.
Those at issue with our thinking was the crossing of 6th
Ave. Eight lanes of road is not exactly pedestrian friendly,
and the off ramp west from Cambie Bridge, that comes to a
"T" intersection, is fixed and we think will be a traffic
congested area.
Steering group discussion came up with these
thoughts:
- Eliminating thru traffic from First, along tracks to
Ash was the key issue. All other planning priorities were
dependent upon achieving this. If First Ave went through
the traffic impacts for those living on Commodore would be
considerable, and the plan to create a public space next
to the Canada Line station, with a pedestrian promenade
down to the Creek, would be severely compromised.
- The consensus was that Dave Osborne should draw up a
draft plan that incorporates the thrust of the planning
session of March 29th. We will use that as reason to get
in front of the senior city planners and engineers, and
reinforcing our major - we will fight it all the way -
opposition to the continuation of First.
- The plan is drawn and now available to the steering
committee, who will meet May 28th, Spyglass location, to
review the draft plan. That plan, as amended, will be
presented to you, the planning group, at a meeting June
11th, 7pm at Spyglass Rec centre. It will also be
distributed widely to the most affected residents - along
Commodore.
- We will then request a meeting with the senior city
group. We would anticipate that meeting later in June.
John McBride, chair